Industrial Combos

Megawatt-Scale Energy Independence

Industrial-grade Solar & Storage infrastructures. Eradicate diesel dependency, shave peak demand charges, and secure your plant’s power continuity.

GRAP & Emission Compliant

Stay operational during government diesel-generator bans (like GRAP in Delhi-NCR). Our BESS provides 100% emission-free, silent heavy-load backup.

Peak Load Shaving

Industrial grid tariffs penalize peak demand. Our smart hybrid systems discharge battery power during peak tariff hours, drastically lowering your factory's utility bills.

Heavy Surge Capacity

Engineered to handle massive inrush currents from induction motors, CNC machines, cold storage compressors, and heavy manufacturing equipment.

Industrial Combos

100kW Hybrid Inverter + 100kWh BESS + 100kWp Solar

200kW Hybrid Inverter + 200kWh BESS + 200kWp Solar

Which Infrastructure Fits My Plant?

  1. “I run a mid-sized factory, cold storage, or large warehousing facility.” -> Explore the 100kW Combo. It provides a perfect balance of daytime solar offset and enough storage to cover critical shifts and heavy compressor loads during grid failures.

  2. “I operate a heavy manufacturing plant, textile mill, or 300+ bed hospital.” -> Explore the 200kW Combo. Engineered for massive continuous loads, high starting torques, and absolute zero-downtime requirements for life-critical or production-critical systems.

FAQs

Do we need a dedicated air-conditioned room for the 100kWh / 200kWh BESS?

Our industrial High-Voltage BESS cabinets come with built-in active thermal management (HVAC/Liquid cooling options). While a shaded, well-ventilated electrical room is standard, we also offer ruggedized, containerized solutions (IP54/IP65) for outdoor plant installations.

Industrial electricity billing often includes high ‘Maximum Demand’ (MD) charges. Our system’s smart BMS can be programmed to discharge the battery precisely when your factory’s load spikes, preventing you from crossing your sanctioned grid load limit and saving you from heavy utility penalties.

Absolutely. Our industrial architecture is highly modular. You can parallel multiple 100kW or 200kW inverter/BESS blocks on the same AC busbar to build a multi-megawatt microgrid as your factory’s production capacity expands.

For industries running multiple shifts or currently relying on heavy diesel usage, the ROI is exceptionally fast—often between 3 to 4.5 years. This factors in the savings from solar generation, the elimination of diesel costs (₹25+/unit), and the 40% Accelerated Depreciation tax benefit available to businesses in India.

Yes. Surin Industrial Hybrid systems feature advanced smart-port functionalities. They can seamlessly communicate with and synchronize with your existing DG sets, ensuring the generator only kicks in if the battery reaches a critical low, drastically saving diesel costs.

Scroll to Top